温馨提示:本站仅提供公开网络链接索引服务,不存储、不篡改任何第三方内容,所有内容版权归原作者所有
meet, itbs, piston, 4-mahle, 5-head, rings, bolts, 3-arp, gasket, head, 2-acl, picks, post, bearings, machined, ported, hyabusa, picked, heard, polished, today, things, 1-copper, good, stock, time, project, thinking, setup, 3sge, turbo, question, fellas, failed, custom, ecu,timing, rail, ports, injector, flange, cable, throttle, pipes, welded, build
.....All right fellas.. I was the guy with the failed turbo 3sge... So new project time...... Im thinking ITB setup but im not sure what I need to run them.. I know custom throttle cable, flange needs to get welded with pipes to meet the ITBs, injector ports need to meet rail,.... can I run the stock ecu,timing?
So far this is what I have for the build
1-copper head gasket
2-ACL rod bearings
3-ARP rod Bolts
4-MAHLE piston rings
5-Head is getting machined and Ported polished
6- Im going